-
Automation Builder is installed and licensed as at least the standard edition.
-
The PLC is assembled and connected to the PC.
-
Configuration and programming for this example are performed in the existing example project for central I/O expansion.
-
The CM579-PNIO communication module is inserted in terminal base and connected to the PLC.
-
The CI502-PNIO communication interface module is inserted in the terminal unit and connected to the PLC.